• Title #0
    Download Original
    Concrete pour at the new headworks basin
  • Title #0
    Download Original
    Connection pumps at new headworks basin
  • Title #0
    Download Original
    New headworks building
  • Title #0
    Download Original
    Forming for concrete pour at the new headworks basin
  • Title #0
    Download Original
    Workers tying steel for a wall at the Headworks Basin which will rise up another 10-15 feet.
  • Title #0
    Download Original
    Workers tying steel for a wall at the Headworks Basin which will rise up another 10-15 feet.
  • Title #0
    Download Original
    Tools of the trade
  • Title #0
    Download Original
    Headworks Basin
  • Title #0
    Download Original
    Headworks Basin
  • Title #0
    Download Original
    Tying steel around effluent pipes that will go to spray irrigation or discharge.
  • Title #0
    Download Original
    Building forms to pour concrete at the Headworks Basin.
  • Title #0
    Download Original
    Initial excavation at headworks building
  • Title #0
    Download Original
    Initial concrete pour at Headworks