• Title #0
    Download Original
    Crew framing the retaining wall around the Chemical/Electrical Building.
  • Title #0
    Download Original
    Digging the footing for the retaining wall of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Excavating footings for the retaining wall of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Excavating footings for the retaining wall of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Excavating footings for the retaining wall of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Excavating footings for the retaining wall of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Crews measuring elevation to determine depth for the footing of the Chemical/Electrical Building.
  • Title #0
    Download Original
    Pre-excavation of the floor for the building and wall of Chemical/Electrical Building.
  • Title #0
    Download Original
    Pre-excavation of the floor for the building and wall of Chemical/Electrical Building.
  • Title #0
    Download Original
    Keyway for the retaining wall and foundation of Chemical/Electrical building.
  • Title #0
    Download Original
    Keyway for the retaining wall and foundation of Chemical/Electrical building.
  • Title #0
    Download Original
    Progress on the Chemical/Electrical Building.
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Rough construction of access road north of the proposed membrane building site
  • Title #0
    Download Original
    Rebar and forming for the retaining walls of the Chemical/Electrical building
  • Title #0
    Download Original
    Stripping forms from the first retaining wall pour.
  • Title #0
    Download Original
    Starting to set forms for the membrane building footing along the south wall line
  • Title #0
    Download Original
    Preparing for concrete pour for conduits. The form is a replica of what the transformer pad will look like. The distance from transformer to the electrical building is critical so the template ensures being exact.
  • Title #0
    Download Original
    Preparing for concrete pour for conduits. The form is a replica of what the transformer pad will look like. The distance from transformer to the electrical building is critical so the template ensures being exact.
  • Title #0
    Download Original
  • Title #0
    Download Original
    Working under the tarp to keep concrete curing at the right temperature
  • Title #0
    Download Original
    Work on pedestals during the snow. There will be sixteen 10” square tube columns and five 8” square tube columns to support the overhead bridge crane and roof.
  • Title #0
    Download Original
    Work on pedestals during the snow. There will be sixteen 10” square tube columns and five 8” square tube columns to support the overhead bridge crane and roof.
  • Title #0
    Download Original
    Work on pedestals during the snow. There will be sixteen 10” square tube columns and five 8” square tube columns to support the overhead bridge crane and roof.
  • Title #0
    Download Original
    Work on pedestals during the snow. There will be sixteen 10” square tube columns and five 8” square tube columns to support the overhead bridge crane and roof.
  • Title #0
    Download Original
    Work on pedestals during the snow. There will be sixteen 10” square tube columns and five 8” square tube columns to support the overhead bridge crane and roof.
  • Title #0
    Download Original
    Crew installed metal plates onto the bolts to keep them in the exact location during concrete pour. Large structural steel tube columns (10” and 8” square) will mount on the shown anchor bolts at the top of the pedestals at floor level, and support the overhead bridge crane and the roof.
  • Title #0
    Download Original
    Retaining wall for the Electrical/Chemical Building
  • Title #0
    Download Original
    Retaining wall west of the Chemical/Electrical building
  • Title #0
    Download Original
    Retaining wall north of the proposed chemical / electrical building
  • Title #0
    Download Original
    Line feed pumps. The old soda ash system is being replaced with lime which will do a better job reducing hardness in the wastewater.
  • Title #0
    Download Original
    Outside wall of chemical electrical building
  • Title #0
    Download Original
    Setting the new PG&E transformer
  • Title #0
    Download Original
    Laying in the new electrical cable to the new transformer
  • Title #0
    Download Original
    Inside for new transformer
  • Title #0
    Download Original
    Tying into the new transformer
  • Title #0
    Download Original
    Electrical conduits off the news transformer for the CE building
  • Title #0
    Download Original
    Tying rebar at the CE building
  • Title #0
    Download Original
    Tying rebar at the CE building
  • Title #0
    Download Original
    Framing for the concrete pour
  • Title #0
    Download Original
    Rebar at the CE building
  • Title #0
    Download Original
    Concrete form at CE building
  • Title #0
    Download Original
    Removing forms at Chemical/Electrical Building
  • Title #0
    Download Original
    Conduit outside of the Chemical/Electrical Building
  • Title #0
    Download Original
    Conduits at the Chemical/Electrical Building
  • Title #0
    Download Original
    Conduits that will be under the slab in the Chemical/Electrical Building
  • Title #0
    Download Original
    An intricate network of rebar at the Chemical/Electrical Building
  • Title #0
    Download Original
    Laying brick
  • Title #0
    Download Original
    Constructing brick walls at Chemical/Electrical building
  • Title #0
    Download Original
    Constructing brick walls at Chemical/Electrical Building
  • Title #0
    Download Original
    Conduit at Chemical/Electrical Building